SP or MPO requests a metering point change, MPO reviews and either performs or rejects.
The SP / PU / GO request changes to the MPO or the MPO himself causes a change. The MPO reviews the change request. The MPO rejects the change of the measuring point by the SP / PU / GO or the MPO confirmes the request of the SP / PU / GO. The MPO performs the measuring point change. The MPO reports the implementation to the SP / PU / GO or notifies the SP / PU / GO about the failure of the changes.
| Activity | Actor |
|---|---|
| Request Change | SP / PU / GO / MPO |
| Review Change | MPO |
| Perform Change | MPO |
| Report Result | MPO |