Master Data Change

EC initiates a master data change, IP checks feasibility and confirms or rejects.


Process Description

The EC tells the INQ about the change of his master data. The INQ notifies the IP of the change. The IP checks whether the master data can be changed at the desired time. The IP confirmes the changes of the INQ or the IP rejectes the changes of the INQ.

Structure

Zoom and pan enabled · Source: PET Dataset (Bellan et al., 2022)

Elements

ActivityActor
Notify ChangeEC
Forward NotificationINQ
Check FeasibilityIP
Confirm ChangesIP
Reject ChangesIP